Concessio
Infrastructure Intelligence
Browse
Docs
App
Concessio Registry · Sector directory
Toll Road concessions
3,450 tracked Toll Road concession records worldwide, 26 published with verified detail. Each resolves a canonical Concessio ID. Page 14 of 35.
Four laning of Jetput - Somnath Section of NH 80 in the State of Gujarat
India · ends 2035
Four Laning of Jorabat-Barapani section from km. 0 to 61.800 of NH 40 in the state of Meghalaya under SARDP NE Phase A on BOT Annuity basis.
India · ends 2032
Four laning of Jorhat-Demow section from Km 453 to 534.8 (part of Nagaon-Dirbugah section) of NH 37 in the State of Assam under SARDP-NE Phase A on BOT (Annuity) basis
India · ends 2033
Four laning of Kannur-Vengalam section of NH-17 (Package I) from Km 148.00 to Km 230 in the State of Kerala under NHDP III on BOT basis
India · ends 2033
Four laning of Karaikkudi-Ramanathapuram section of NH-210 (101 kms)in the State of Tamil Nadu under NHDP Phase III on BOT basis.
India · ends 2033
Four laning of Karnataka/Kerala border - Kannur section in Kerala
India · ends 2035
Four laning of Kazhakkuttam to Mukkola section in the State of Kerala
India · ends 2039
Four Laning of Kerala/ Tamil Nadu border, Kanyakumari section of NH 47 (Package II)
India
Four laning of Khagaria-Bhaktiarpur section of NH31 in the state of Bihar
India · ends 2033
Four Laning of Khalghat-MP/ Maharashtra Border section of NH-3 from Km. 84.700 to Km.167.500 in the state of M.P. on BOT basis.
India · ends 2032
Four laning of Krishnanagar-Baharampur section of NH 34 from Km 115 to km 193 in the State of West Bengal
India · ends 2035
Four laning of Kundapur to Suratkal section ( Km 284 to 358) and Mangalore-Kerala border section (km 375.300 to 376.700 and from Km3.700 to 17.200) of NH 17 Under NHDP Phase III on BOT Basis
India · ends 2033
Four laning of Kuttipuram-Edapally section of NH17 in the state of Kerala
India · ends 2033
Four laning of Lebad-Jaora section of SH 31 in Madhya Pradesh
India · ends 2032
Four laning of Lucknow -Sultanpur section of NH 56 under NHDP Phase IV, length 123.40 km
India · ends 2036
Four laning of Lucknow Raebarelly Section of NH-24 B from km 12.700 to km 82.700 on BoT (Annuity) under NHDP Phase-IV B in the State of U.P.
India · ends 2036
Four Laning of Lucknow Sultanpur Section of NH-56 on Hybrid Annuity Mode
India · ends 2041
Four laning of Lucknow-Sultanpur Section of NH 56 from KM 11.5 to KM 135 under NHDP IV
India · ends 2039
Four laning of Ludhiana-Talwandi section of NH 95 from km 92 to km 170 in the State of Punjab under BOT (Toll) NHDP III on DBFOT
India · ends 2035
Four laning of Maharashtra/Karnataka Border to Sangareddy Section of NH 9 from Km 348/800 to km 423/800 on BoT (Toll) in the state of Karnataka and Andhra Pradesh under NHDP Phase IVB
India · ends 2036
Four laning of Mangwan to MP/UP border section of NH 27 under VGF Scheme, length 52.074 km
India · ends 2036
Four laning of Mangwan to Satna to Bela section of NH 75 under VGF Scheme, length 48.04 km
India · ends 2036
Four laning of Manjarsumba-Lokhandi-Sawargaon-Latur
India · ends 2032
Four laning of Manpur-Jagraon-Rajkot-Abohar section of MDR 51 on BOT (Toll)
India · ends 2036
Four laning of Meerut-Karnal Road in SH 82 in the State of Uttar Pradesh
India · ends 2037
Four laning of Mohania - Ara section of NH -30 (KM 0.000 to KM 116.700) in the State of Bihar on DBFOT (Toll) basis
India · ends 2039
Four laning of MP/Maharashtra border-Nagpur section of NH7 including Kamptee-Kahnan and Nagpur bypass in the State of Maharashtra
India · ends 2033
Four laning of Muzaffarnagar-Haridwar section of NH 58 from km 131 to 211 of NH 58 in the state of UP and Uttarakhand
India · ends 2034
Four laning of Muzzafarnagar-Nepali farm section of NH 58 in the State of Uttar Pradesh and Uttrakhand from Nepali to ISBT Dehradun
India · ends 2033
Four laning of Nagapatnam-Thanjavur section of NH 67 from km 1.600 to km 80.00 in the state of Tamil Nadu under NHDP Phase IIIA on BOT (Toll) basis
India · ends 2033
Four laning of Nagina Kashipur Section of NH 74 from KM 71.614 to KM 170.407 under NHDP IV
India · ends 2039
Four laning of Nagpur Saoner Pandhurna Betul section of NH 69 from km 3.000 to km 59.300 in the state of Maharashtra and km 137.000 to km 257.400 in the state of MP on BOT (Annuity) basis
India · ends 2035
Four laning of Nagpur Wainganga Bridge Section of NH 6 from km 498 to km 544.200 in the State of Maharashtra under NHDP Phase III on BOT(Toll) basis
India · ends 2036
Four laning of Narketpally-Addanki-Medarametla Road Project
India · ends 2034
Four Laning of Nelamangala Junction on NH-4 with NH-48 to Devihalli in the state of Karnataka under NHDP phase III A on BOT basis
India · ends 2031
Four laning of Ochira-Thiruvananthapuram section of NH-47 (Package II) from Km 465.000 (Ochira) to Km 551.900 (Kazakuttam jn) in the State of Kerala under NHDP III on BOT basis
India · ends 2033
Four Laning of Osmanabad (Yedshi)- Latur- Nanded Road
India · ends 2033
Four Laning of Pandoh-Takoli Highway
India · ends 2033
Four Laning of Panikoili-Rimuli Section of NH 215 under NHDP Phase III, length 163 km
India · ends 2035
Four laning of Patna-Buxar section of NH 30 in the state of Bihar
India · ends 2033
Four laning of Patna-Muzaffarpur stretch of NH 77from Km 0 to Km 46.30 and construction of Muzzafarpur bypass for connection to NH 28 in the Satae of Bihar. under NHDP Phase III on BOT(Annuity) Basis
India · ends 2033
Four laning of Phagwara-Rupnagar of NH-344A in Punjab on Hybrid Annuity Mode (total 80.82 KM)
India · ends 2041
Four Laning of Pondicherry to Tindivanam on NH-66 in the state of Tamil Nadu under NHDP Phase III A on BOT basis
India · ends 2031
Four laning of PSS of Sangrur - Punjab/Haryana border section of NH - 71 from km 181.805 (Sangrur) to km 238.695 (Punjab/Haryana border) in the State of Punjab on BOT (Toll) basis under NHDP - IV
India · ends 2038
Four laning of Pukhrayan-Ghatampur-Bindaki (Chawdagra) of SH 46 from km 0.0 to km 82.220
India · ends 2036
Four laning of Pune -Sholapur section (km 144.00 to 249.00) of NH9 in the State of Maharashtra under NHDP III A on BOT (Toll) basis - Package II
India · ends 2034
Four laning of Pune-Sholapur section of NH 9 under NHDP Phase III, length 110.05 km Package II
India · ends 2033
Four laning of Puthalapattu-Naidupet Road Project
India · ends 2034
Four laning of Qazigund to Banihal Section of NH 1A from km 189.350 to km 204.700 including 2 tunnels of 0.69 km and km 8.45 length on BOT (Annuity) basis in the State of Jammu and Kashmir
India · ends 2034
Four laning of Raiganj-Dalkhola section of NH 34 from km 398 to km 452.700 in the state of West Bangal on DBFOT basis under NHDP III
India · ends 2034
Four laning of Rajauli - Bakhtiyarpur section of NH -31 in the State of Bihar on DBFOT (Toll) basis
India · ends 2039
Four laning of Rampur-Kathgodam section of NH-87 from km 0.000 to km 88.000 in the state of Uttar Pradesh and Uttarakhand under NHDP Phase-III on BoT (Toll) basis
India · ends 2036
Four laning of Ranchi Jamshedpur section of NH33 in the State of Bihar on BoT (Annuity) under NHDP Phase III
India · ends 2035
Four laning of Rewa to MP/UP Border of NH 7 in the State of Madhya Pradesh
India · ends 2036
Four laning of Rewa to MP/UP Border of NH 7 under VGF scheme, length 89.30 km
India · ends 2036
Four Laning of Rimuli Roxy Rajamunda Section of NH 215 from Km 163 to Km 269 in the State of Orissa under NHDP Phase IIIA on BOT Basis.
India · ends 2032
Four laning of Rohtak to Bawal Section of NH 71 in the state of Haryana on DBFOT basis under NHDP III
India · ends 2034
Four laning of Rohtak to Panipat section of NH 71A from km 0 to km 80.858 in the state of Haryana on BOT basis under NHDP III
India · ends 2034
Four laning of Sambalpur - Rourkela section of SH-10 from km 4.900 to to km 167.900 (Rourkela) under DBFOT
India · ends 2037
Four laning of Sambalpur Baragarh of Orissa/Chhatisgarh border section of NH 6 from Km 0 to Km 88 in Orissa
India · ends 2035
Four laning of sections from km 277.500 to km 333.500 (Mahullia to Bahragora) of NH 33 and from km 200.55 to km 134.40 (Bahragora to Kharagpur) of NH 6 in the State of Jharkhand and West Bengal under NHDP Phase IVB on DBFOT (Toll) basis
India · ends 2036
Four laning of Shikrapur Nhavra - Kedgoan-Chousla, km 53 to km 81.4 of SH-55, and km 16.8 to km 41.7 of SH-62
India · ends 2036
Four laning of Shivpuri - Dewas section of NH3 from km 15.623 to km 566.45 in the State of Madhya Pradesh under NHDP Phase IV on BOT (Toll) basis.
India · ends 2036
Four laning of Sidhi to Singrauli section of NH 75E under VGF Scheme, length 102.60 km
India · ends 2036
Four laning of Singhara-Bhinjhabal Section of NH6 from KM 310.806 to KM 414.982 under NHDP IV
India · ends 2039
Four laning of Solapur - Bijapur section of NH 13, under NHDP Phase III from km 0.000 to 110.542 in the States of Maharashtra and Karnataka on BOT (Toll) Basis
India
Four laning of Solapur-Maharashtra/Karnataka Border section of NH-19 from km 249.000 to km 348.800 in the State of Maharashtra under NHDP Phase IV B on BoT (Toll) basis.
India · ends 2036
Four laning of Sultanpur-Varanasi Section of NH-56 from km 134.700 to km 271.300 in the State of Uttar Pradesh under NHDP - IV on DBFOT (Toll) basis.
India · ends 2039
Four laning of Talegaon - Amravati section of NH 6 in Maharashtra on DBFOT basis
India · ends 2034
Four laning of Tirupati-Tiruthani-Chennai section of NH 205 from km 274.800 to km 341.600 in Andhra Pradesh and km 0 to 59.60 in Tamil Nadu Under NHDP Phase III on BOT Basis
India · ends 2033
Four Laning of Trichy city Junction with NH-45 B on NH-67 to Karur on NH-67 in the state of Tamil Nadu under NHDP Phase III A on BOT basis
India · ends 2031
Four laning of Trichy Karaikkudi section of NH-210 (km 10.000 to km 94.000) and Trichy Bypass (ch 109.558 to ch 135.390) in the State of Tamil Nadu under NHDP Phase III on BOT basis.
India · ends 2033
Four Laning of Trivandrum, Kerala/ Tamil Nadu border including Trivandrum by-pass (Package I)
India · ends 2033
Four laning of Vengalam-Kuttipuram section of NH-17 (Package II) from Km 230.00 to Km 318 in the State of Kerala under NHDP III on BOT basis
India · ends 2033
Four Laning of Vijaywada-Machilipatnam section of NH 9 under NHDP Phase III, length 64.611 km
India · ends 2036
Four Laning of Walayar to Vadakkancherry Section (Package No.NS-2/BOT/KL-2)
India · ends 2036
Four laning of Zirakpur to Patiala section of NH 64 from km 0 to km 50.700 in the State of Punjab
India · ends 2036
Four laning of Zirakpur to Patiala section of NH 64 under VGF Scheme, length 50.70 km
India · ends 2039
Four laning with paved shoulder Delhi-Saharanpur-Yamunotri Road upto Uttrakhand Boarder (SH 57) on DBFOT basis
India · ends 2037
Four laning with paved shoulder in Bareilly-Almora section of SH 37 in the State of Uttar Pradesh on DBFOT basis
India · ends 2036
Four laning with paved shoulders of Bhopal to Biaora section in the state of Madhya Pradesh
India · ends 2036
Four laning with paved shoulders of Sinnnar - Nashik Section of NH-50 (km 177 to 201.35 in the state of Maharashtra under National Highways (Others) on BOT (Toll) Basis
India · ends 2036
Four laning with paved side shoulders of a section betwwen Jharpokharia Baleshwar
India · ends 2038
Four laning with PSS of a section between Ghoshpukur- Falakata-Salsalabari Section of NH 31D in the state of West Bengal on BOT (Toll) basis under NHDP-II.
India · ends 2038
Four laning with PSS of Amritsar to Bathinda section of NH - 15 from km 103.000 to km 287.500 in the State of Punjab on BOT (Toll) basis under NHDP - IV
India · ends 2039
Four laning with PSS of Aurangabad to Yedshi section on NH 211 from km 100.000 to km 290.200 in the State of Maharashtra on DBFOT pattern
India · ends 2038
Four laning with PSS of Jodhpur-Pali section of NH-65
India · ends 2037
Four laning with PSS of Rai Malikpur-Narnaul-Dadri-Bhiwani-Kharak corridor on DBFOT (Toll)
India · ends 2037
Four laning with PSS of Solapur to Yedshi section on NH 211 from km 0.000 to km 100.000 in the State of Maharashtra on DBFOT pattern
India · ends 2038
Four lanning of Nagpur_Umred_Chandrapur (MSH-9) Road from km 10|200 to km 74|400 length 64.20 km in Maharashtra State
India · ends 2039
Four lanning of Narketpally - Addanki - Medarametla Road under PPP on BOT on Toll Basis (SH-2)
India · ends 2035
Four-Lane Patna – Arrah - Sasaram Access Controlled Greenfield Corridor’ as a new National Highway NH-119A on Hybrid Annuity Model (HAM)
India
Four-lane STRR, NH948A - Obalapura to S.Mudugadapalli in Karnataka & Tamil Nadu on HAM.
India
Four-lane, Badvel to Nellore section of NH-67 in the state of Andhra Pradesh on HAM
India
Four-lane, Parmakudi to Ramanathapuram Section of NH-87 in the state of Tamil Nadu on HAM
India
Four-laning a section between Khed-Sinnar section of NH 50 from km 42 to km 177 in the State of Maharashtra under NHDP-IV on BOT (Toll) basis.
India · ends 2037
Four-laning a section between Yadgiri-Warangal section of NH 202 from km 54.000 to km 150.000 in the State of Andhra Pradesh under NHDP-IV on BOT (Toll) basis
India · ends 2039
Four-laning a section of the National Highway 73, between 4 Laning of Panchkula, Yamunanagar section from Km 71.640 to Km 179.285 in the State of Haryana under NHDP-III on BOT (Toll) basis:
India · ends 2036
Four-laning Kiratpur- Ner Chowk Section from Km 73.20 to Km 186.50 of NH-21 in the State of Himachal Pradesh under NHDP-III on BOT (Toll) basis:
India · ends 2036
Four-laning of a section under NHDP-IV, between Hubli - Hospet section of NH 63 from km 129+249 to km 267+000 in the State of Karnataka on BOT (Toll) basis.
India · ends 2037
1
2
13
Page 14
15
34
35
All countries and sectors →