ConcessioInfrastructure Intelligence
Concessio Registry · Verified

John Hart Hydroelectric Generating Station Concession

Power Distribution concession in Canada · BC Hydro / Government of British Columbia
Canonical Concessio ID
CA21X0000019
Display format: CA-21-X-000001-9
Country
Canada (CA)
Sector
Power Distribution (21)
Family
Utilities
Structure
BOT/Concession
Full structure
Grantor
BC Hydro / Government of British Columbia
Operator
BBGI Global Infrastructure
Term start
Contract end
About Concessio IDs

A Concessio ID is a 12-character canonical identifier for an infrastructure concession. The format is CC-AA-S-NNNNNN-K — country, asset class, structure, sequence, and a Luhn check digit. The check digit protects against typos and fabricated IDs.

Concessio IDs are stable for the life of the concession. They do not change if the asset is renamed, sold, or restructured. Cite them in filings, press releases, research reports, and contracts.