ConcessioInfrastructure Intelligence
Concessio Registry · Verified

Tanjung Jati B Coal-Fired Power Plant (Units 5 & 6)

Energy Generation concession in Indonesia
Canonical Concessio ID
ID21R0000012
Display format: ID-21-R-000001-2
Country
Indonesia (ID)
Sector
Energy Generation
Family
Structure
BROT (R)
Full structure
Build-Rehabilitate-Operate-Transfer
Grantor
Operator
Sumitomo Corporation
Term start
Contract end
Financial close
2017 (World Bank PPI)
Contract period
25 years
Total investment
US$4,194m
PPI structure
Build, rehabilitate, operate, and transfer
Granting government
Federal (tier)
About Concessio IDs

A Concessio ID is a 12-character canonical identifier for an infrastructure concession. The format is CC-AA-S-NNNNNN-K — country, asset class, structure, sequence, and a Luhn check digit. The check digit protects against typos and fabricated IDs.

Concessio IDs are stable for the life of the concession. They do not change if the asset is renamed, sold, or restructured. Cite them in filings, press releases, research reports, and contracts.