ConcessioInfrastructure Intelligence
Concessio Registry · Verified

Azura-Edo Gas-Fired Power Plant Phase 1

Energy Generation concession in Nigeria
Canonical Concessio ID
NG21W0000031
Display format: NG-21-W-000003-1
Country
Nigeria (NG)
Sector
Energy Generation
Family
Structure
BOO (W)
Full structure
Build-Own-Operate
Grantor
Operator
Amaya Capital Partners / American Capital Energy & Infrastructure / Old Mutual
Term start
Contract end
About Concessio IDs

A Concessio ID is a 12-character canonical identifier for an infrastructure concession. The format is CC-AA-S-NNNNNN-K — country, asset class, structure, sequence, and a Luhn check digit. The check digit protects against typos and fabricated IDs.

Concessio IDs are stable for the life of the concession. They do not change if the asset is renamed, sold, or restructured. Cite them in filings, press releases, research reports, and contracts.