ConcessioInfrastructure Intelligence
Concessio Registry · Verified

Costa Sierra: Ovalo-Chancay-Huaral-Acos Stretch

Toll Road concession in Peru · MTC / ProInversion
Canonical Concessio ID
PE11R0000073
Display format: PE-11-R-000007-3
Country
Peru (PE)
Sector
Toll Road (11)
Family
Transport
Structure
ROT (R)
Full structure
Rehabilitate-Operate-Transfer
Grantor
MTC / ProInversion
Operator
Conalvias
Term start
Contract end
Financial close
2009 (World Bank PPI)
Contract period
15 years
Total investment
US$31m
PPI structure
Rehabilitate, operate, and transfer
Granting government
Federal (tier)
Intelligence on this concession
Operating KPIs4 datapoints · 2022–2025
Aadt▪▪▪▪▪ annual series
Full data — clause text, term values, KPI series, comps — is available in the Concessio app.Unlock with Concessio →
About Concessio IDs

A Concessio ID is a 12-character canonical identifier for an infrastructure concession. The format is CC-AA-S-NNNNNN-K — country, asset class, structure, sequence, and a Luhn check digit. The check digit protects against typos and fabricated IDs.

Concessio IDs are stable for the life of the concession. They do not change if the asset is renamed, sold, or restructured. Cite them in filings, press releases, research reports, and contracts.