ConcessioInfrastructure Intelligence
Concessio Registry · Verified

North Marmara Motorway (Kurtkoy - Akyazi Section)

Toll Road concession in Turkiye
Canonical Concessio ID
TR11B0000030
Display format: TR-11-B-000003-0
Country
Turkiye (TR)
Sector
Toll Road (11)
Family
Transport
Structure
BOT (B)
Full structure
Build-Operate-Transfer
Grantor
Operator
Limak Holding / Cengiz Holding
Term start
Contract end
Financial close
2018 (World Bank PPI)
Contract period
7 years
Total investment
US$1,634m
PPI structure
Build, operate, and transfer
Granting government
Federal (tier)
About Concessio IDs

A Concessio ID is a 12-character canonical identifier for an infrastructure concession. The format is CC-AA-S-NNNNNN-K — country, asset class, structure, sequence, and a Luhn check digit. The check digit protects against typos and fabricated IDs.

Concessio IDs are stable for the life of the concession. They do not change if the asset is renamed, sold, or restructured. Cite them in filings, press releases, research reports, and contracts.