Redstone Concentrated Solar Thermal Power (CSP) plant
Energy Generation concession in South Africa
Canonical Concessio ID
ZA21B0000024
Display format: ZA-21-B-000002-4
Country
South Africa (ZA)
Sector
Energy Generation
Family
—
Structure
BOT (B)
Full structure
Build-Operate-Transfer
Grantor
—
Operator
ACWA Power
Term start
—
Contract end
—
Financial close
2021 (World Bank PPI)
Contract period
20 years
Total investment
US$826.3m
PPI structure
Build, operate, and transfer
Granting government
Federal (tier)
Intelligence on this concession
Comparable transactions1 linked transaction
Transaction records▪▪▪▪▪ value + parties + source
Full data — clause text, term values, KPI series, comps — is available in the Concessio app.Unlock with Concessio →
About Concessio IDs
A Concessio ID is a 12-character canonical identifier for an infrastructure concession. The format is CC-AA-S-NNNNNN-K — country, asset class, structure, sequence, and a Luhn check digit. The check digit protects against typos and fabricated IDs.
Concessio IDs are stable for the life of the concession. They do not change if the asset is renamed, sold, or restructured. Cite them in filings, press releases, research reports, and contracts.