ConcessioInfrastructure Intelligence
Concessio Registry · Verified

Neusberg Hydro Electric Plant

Energy Generation concession in South Africa
Canonical Concessio ID
ZA21B0000040
Display format: ZA-21-B-000004-0
Country
South Africa (ZA)
Sector
Energy Generation
Family
Structure
BOT (B)
Full structure
Build-Operate-Transfer
Grantor
Operator
Hydro Tasmania / Old Mutual / Industrial Development Corporation
Term start
Contract end
Financial close
2013 (World Bank PPI)
Contract period
20 years
Total investment
US$56m
PPI structure
Build, operate, and transfer
Granting government
Federal (tier)
About Concessio IDs

A Concessio ID is a 12-character canonical identifier for an infrastructure concession. The format is CC-AA-S-NNNNNN-K — country, asset class, structure, sequence, and a Luhn check digit. The check digit protects against typos and fabricated IDs.

Concessio IDs are stable for the life of the concession. They do not change if the asset is renamed, sold, or restructured. Cite them in filings, press releases, research reports, and contracts.