Power Distribution concession in South Africa · Eskom
Canonical Concessio ID
ZA21R0000012
Display format: ZA-21-R-000001-2
Country
South Africa (ZA)
Sector
Power Distribution (21)
Family
Utilities
Structure
BROT (R)
Full structure
Build-Rehabilitate-Operate-Transfer
Grantor
Eskom
Operator
Electricite de France / E.ON
Term start
—
Contract end
—
Financial close
1995 (World Bank PPI)
Total investment
US$3m
PPI structure
Build, rehabilitate, operate, and transfer
Granting government
Federal (tier)
About Concessio IDs
A Concessio ID is a 12-character canonical identifier for an infrastructure concession. The format is CC-AA-S-NNNNNN-K — country, asset class, structure, sequence, and a Luhn check digit. The check digit protects against typos and fabricated IDs.
Concessio IDs are stable for the life of the concession. They do not change if the asset is renamed, sold, or restructured. Cite them in filings, press releases, research reports, and contracts.