Concessio
Infrastructure Intelligence
Browse
Docs
App
Concessio Registry · Country directory
Infrastructure concessions in India
2,394 tracked concessions in India, 1 published with verified detail. Each resolves a canonical Concessio ID. Page 1 of 24.
Guwahati International Airport Limited (GIAL)
verified
· Airport
'Redevelopment of Vijayawada Railway Station' of the Ministry of Railways on PPP mode with Viability Gap Funding support.
Rail
100 MW Bhadla Solar power plant
Energy Generation · ends 2043
2 laning of Ater-Jaitpur Road and construction of High Level Bridge on Chambal River near Jaitpura Village
Toll Road · ends 2038
2-laning of Tarighat Bara Road (SH-99) from Km.0.000 to Km.39.200 on Design, Build, Finance, Operate and Transfer (DBFOT) toll basis
Toll Road · ends 2038
2-laning of the section Meensurutti-Chidambaram part of NH227
Toll Road · ends 2034
2/4 laning of Akbarpur-Jaunpur-Mirzapur-Dudhi Road (SH-5) on Design, Build, Finance, Operate and Transfer (DBFOT) toll basis
Toll Road · ends 2038
2/4 laning of Moradabad-Chandausi-Badaun from km. 42 to km 201.9 of SH43
Toll Road · ends 2041
2/4 laning of Waturphata-Jintur-Aundha-Basmath Road and Hingoli-Aundha Road
Toll Road · ends 2039
4 laning of end of Pandoh bypass to Takoli section of NH 21 from KM 221.305 to 242.00 KM under NHDP IVB in the State of Himachal Pradesh on Hybrid Annuity Mode
Toll Road · ends 2042
4 laning of Muzaffarpur-Sitamarhi-Sonbarsa secƟon of NH-22 (Design Ch. Km. 0+000 to Design Ch. Km. 82.578) under NH(O) on HAM in the State of Bihar
Toll Road
4 laning of NH-167 from Gudebellur to Mahabubnagar of Hyderabad- Panaji section under NH(O) on HAM in the State of Telangana
Toll Road
4 laning of Sahajahanpur-Hardoi-Lucknow Road (SH-25) on Design, Build, Finance, Operate and Transfer (DBFOT) toll basis
Toll Road · ends 2039
4 laning of Solapur - Bijapur section of NH 13 from KM 0.00 to KM 110.542 in the State of Maharashtra and Karnataka under NHDP Phase III on DBFO (Toll) basis
Toll Road · ends 2042
4 laning with paved shoulder of Porbandar - Dwarka section of NH 8E from KM 356.766 to KM 473 in the State of Gujarat on Hybrid Annuity Mode
Toll Road · ends 2042
4-laning from Dhamasiya (Km132+32) to Bitada/Movi (Km 179+78) section of NH-56 (Pkg-IV) and 4-laning from Nasarpore (Km 208+90) to Malotha (Km 269+11) section of NH-56 (Pkg-VI) on HAM under NH(O) in the State of Gujarat.
Toll Road
4-laning of Aligarh Mathura Road (SH-80) from Km.2.800 to Km.42.260 on Design, Build, Finance, Operate and Transfer (DBFOT) toll basis
Toll Road · ends 2039
4-laning of Aligarh-Kanpur Section
Toll Road · ends 2035
4-Laning of Ausa - Chakur, section of NH-361
Toll Road · ends 2034
4-Laning of Chakur-Loha, section of NH-361
Toll Road · ends 2034
4-Laning of Dhrol - Bhadra Patiya section of NH-151A
Toll Road · ends 2046
4-laning of Etah Sikohabad Road (SH-85) from km 0.000 to km 51.415 on Design, Build, Finance, Operate and Transfer (DBFOT) toll basis
Toll Road · ends 2038
4-laning of highway section from Byrapura to Challakere
Toll Road · ends 2033
4-laning of Jagdishpur - Faizabad
Toll Road · ends 2038
4-laning of Jagtial (Km 0.000) to Karimnagar (Km 58.866) section of NH- 563, Armoor (Km 29.100) to Jagtial (Km 92.700) section of NH-63, and Jagtial (Km 92.700) to Mancherial (Km 160.995) section of NH-63 under NH (O) on HAM in the State of Telangana
Toll Road
4-Laning of Loha-Waranga, section of NH-361
Toll Road · ends 2034
4-laning of Muzaffarnagar - Saharanpur Road (SH-59) from Km.0.000 to Km.52.950 on DBFOT toll basis
Toll Road
4-laning of Muzaffarnagar - Saharanpur Road (SH-59) from Km.0.000 to Km.52.950 on Design, Build, Finance, Operate and Transfer (DBFOT) toll basis
Toll Road · ends 2039
4-laning of NH-150E road between Akkalkot and Solapur
Toll Road · ends 2043
4-laning of NH-161 from Kandi to Ramsanpalle
Toll Road · ends 2044
4-laning of NH-161 from Mangloor to Telangana/Maharashtra Border
Toll Road · ends 2034
4-laning of NH-161 section between Ramsanpalle and Mangloor
Toll Road · ends 2033
4-laning of NH-167 from Gudebellur at Design Km.182+930 to Mahabubnagar at Design Km 262+940 of Hyderabad-Panaji section (length 80.01km) under NH(O) on HAM in the state of Telangana
Toll Road
4-Laning of Oddanchatram - Madathukulam section of NH - 209
Toll Road · ends 2036
4-Laning of Poondiyankuppam to Sattanathapuram
Toll Road · ends 2033
4-laning of Puducherry to Poondiyankuppam Section of NH-45A
Toll Road · ends 2033
4-laning of SangIi-SoIapur (Package-4, Mangalwedha to Solapur) section of NH-166
Toll Road · ends 2034
4-laning of Sangli-Solaopur (Package-1 Sangli to Borgaon) Section of NH-166
Toll Road · ends 2033
4-laning of Sangli-Solapur (Package-2, Borgaon to Watambare) section of NH-166
Toll Road · ends 2033
4-Laning of section Anandapuram–Pendurthi-Anakapalli part of NH-5
Toll Road · ends 2033
4-laning of section Belgaum - Khanapur , part of NH-4A
Toll Road · ends 2035
4-laning of section Bellary to Byrapura, part of NH-150A
Toll Road · ends 2034
4-laning of section between Rohna, Hassangarh and Jhajjar part of NH334B
Toll Road · ends 2033
4-laning of section Challakere to Hariyur part of NH-150A highway
Toll Road · ends 2033
4-laning of section Tumkur to Shivamogga part of NH206
Toll Road · ends 2033
4-laning of the section Gundugolanu-Devarapalli-Kovvuru part of NH16
Toll Road · ends 2033
4-laning of Trichy to Kallagam section of NH 227 highway
Toll Road · ends 2034
4-laning of Tumkur-Shivamogga section, part of NH-206
Toll Road · ends 2034
4/6 laning of Dewas Bypass from Km 0/00 on sH-18 to km. to 19/800 on NH-3 on DBFOT basis.
Toll Road · ends 2041
4/6-laning of the Narnaul Bypass crossing to Paniyala section of National Highway 148B (NH-148B)
Toll Road · ends 2044
400 MW Engie solar power plant
Energy Generation · ends 2049
50 MW LNG based power plant at Hope Town
Energy Generation · ends 2040
6 laning of Narasannapeta-Ranastalam section on NH-16 (old NH-5) from km 580.671 to km 634.861 in the state of Andhra Pradesh under NHDP Phase V on Hybrid Annuity Mode
Toll Road · ends 2042
6-laning and strengthening of NH248A in Gurugram
Toll Road · ends 2043
6-laning of Bengaluru-Nidagatta section, part of NH-275
Toll Road · ends 2034
6-laning of Chakeri Allahabad section NH-2 (from km 483.687 to km 628.753)
Toll Road · ends 2033
6-laning of NH5 road between Chandikhole and Bhadhrak
Toll Road · ends 2033
6-Laning of Ramanattukara Junction to start of Valanchery bypass section of NH – 66
Toll Road · ends 2036
6-laning of section Chittor to Mallavaram part of NH140
Toll Road · ends 2034
6-laning of section Gurgaon-Sohna part of NH248A
Toll Road · ends 2033
6-laning of section Khairatunda to Barwa Adda part of NH-2
Toll Road · ends 2033
6-laning of section Nidagatta-Mysore, part of NH-275
Toll Road · ends 2034
6-laning of the new NH-248A in Haryana (13 km section)
Toll Road · ends 2034
6-laning of the section Bhadrak-Baleshwar part of NH5
Toll Road · ends 2033
6-laning of the section Ranastalam-Naransannapeta part of NH16
Toll Road · ends 2033
8-laning of 23.40 km section of Vadodara-Mumbai Expressway
Toll Road · ends 2033
A2Z Punjab Biomass Projects
Energy Generation · ends 2025
AAI 11 Airports Tier-2 PPP Leasing NMP-II
Airport
Aaravalli Transmission Services (ATSL) Rajasthan
Transmission · ends 2052
Aavantika Gas Indore-Ujjain GA
Gas Distribution
ABC Jodhpur Solar PV Plant
Energy Generation · ends 2046
ABG Kandla Container Terminal Limited
Port · ends 2013
Abhijeet Angul-Sambalpur Toll Road Limited
Toll Road · ends 2042
Abhijeet Bihar Roadways Limited
Toll Road · ends 2026
Abhijeet Hazaribagh Toll Road Limited
Toll Road · ends 2035
Abhijeet MADC Nagpur Energy Private Limited (AMNEPL
Energy Generation · ends 2043
Abhijeet Naukh CSP Solar Plant Phase I
Energy Generation · ends 2036
Abhijeet Toll Road Karnataka Limited
Toll Road · ends 2042
Abhor - Bali - Mundara
Toll Road · ends 2035
Acciona Wind Energy Private Limited
Energy Generation · ends 2034
ACME Aarohi Solar Power Plant
Energy Generation · ends 2040
ACME Dayanidhi Solar Power Plant
Energy Generation · ends 2040
ACME Jaipur 250MW Solar Power Plant
Energy Generation · ends 2043
Acme Jaisalmer Solar_Andhra
Energy Generation · ends 2040
ACME Niranjana Solar Power Plant
Energy Generation · ends 2040
ACME Raipur Solar Power Project
Energy Generation · ends 2040
ACME Solar Energy (Madhya Pradesh) Private Limited
Energy Generation · ends 2038
Acme Solar NSM
Energy Generation
ACME Vishwatma Solar Power Plant
Energy Generation · ends 2040
ACME_Rajasthan Solar Projects Portfolio
Energy Generation · ends 2039
ACP Tollways Private Limited
Toll Road · ends 2032
AD Hydro Power Limited
Energy Generation
Adani Abdasa Solar Plant
Energy Generation · ends 2036
Adani Electricity Mumbai (AEML)
Power Distribution
Adani Green Tamil Nadu 216MW Solar Project
Energy Generation · ends 2041
Adani Maharashtra Power Limited
Energy Generation · ends 2034
Adani Murmugao Port Terminal Private Ltd
Port · ends 2040
Adani Power Maharashtra Limited–Transmission
Transmission · ends 2036
Adani Power Rajasthan Limited
Energy Generation · ends 2036
AE Tollway Limited
Toll Road
Page 1
2
23
24
All countries and sectors →