Concessio
Infrastructure Intelligence
Browse
Docs
App
Concessio Registry · Country directory
Infrastructure concessions in India
2,394 tracked concessions in India, 1 published with verified detail. Each resolves a canonical Concessio ID. Page 23 of 24.
Two laning of Ujjain Unhel Nagda Jawra Road
Toll Road · ends 2034
Two laning of Ujjain-Maksi Road (MDR) from Km. 1.890 at Ujjain town to Km 38.230 near Maksi town on Build, Operate and Transfer (BOT) basis
Toll Road · ends 2038
Two laning of Whaghari- Ribbanpally stretch
Toll Road · ends 2033
Two laning of Zojila Tunnel of 14.083 km length on NH - 1D in the State of Jammu & Kashmir on BOT annuity basis
Toll Road · ends 2038
Two Laning Road with Paved Shoulder of Gadag to Honnali (SH 57 and SH 26)
Toll Road · ends 2028
Two laning with granular shoulder from km 0.00 to km 38.00 of Lakhnadon-Ghansore section of SH 40 on DBFOT (Toll) basis
Toll Road · ends 2036
Two laning with granular shoulder from km 0/10 to km 67/10 of Balaghat to Baihar section of SH 26 on DBFOT (Toll) basis
Toll Road · ends 2036
Two laning with granular shoulder from km 1/5 to km 51/4 in Seoni and km 51/4 to km 24/10 in Balaghat of Seoni-Katangi section of SH 54 on DBFOT (Toll) basis
Toll Road · ends 2036
Two laning with granular shoulders of Ratlam - Sailana - Banswada - section from Ratlam city at km 0.00 and ends at Banswada (MP - Rajasthan Border) at km 42.6 on SH-39 under DBFOT (Toll)
Toll Road · ends 2037
Two laning with hard shoulder of Dadu-Sambar Road on BOT (Toll) basis
Toll Road · ends 2035
Two laning with pave shoulder from Aligarh to Kanpur from Km 140.100 to Km 418.760 on NH 91 in the State of UP
Toll Road · ends 2035
Two laning with pave shoulder from Bilaspur - Urdawal section Km 3116 to Km 312.400 of 4 on NH 200
Toll Road · ends 2035
Two laning with Pave shoulder from Varanasi to Gorakhpur section Km 2 to Km 208 of NH 29 in the State of UP
Toll Road · ends 2035
Two laning with pave shoulder on Raigarh - Saraipalli from 3.800 to Km 90.460 on NH 216 in the State of Chattisgarh
Toll Road · ends 2035
Two laning with paved shoulder / Four laning of Tamil Nadu / Karnataka Border to Bangalore section of NH-209 from km 266.530 to km 458.52 in the State of Karnataka under NHDP Ph IV on DBFOT (Toll) basis
Toll Road · ends 2039
Two laning with paved shoulder from km 0.000 to km7.950 ( Katni Bypass) & km 4.600 to km 245.000 of Katni - Shahdol - Anooppur to MP/CG Border section on NH-78 in the State of Madhya Pradesh on DBFOT
Toll Road · ends 2038
Two laning with paved shoulder from Kozhikode - Muthanga section of NH 212 in Kerala
Toll Road · ends 2035
Two laning with paved shoulder of Dindigul - Theni and Theni - Kumili in Tamil Nadu under NHDP III
Toll Road · ends 2035
Two laning with paved shoulder of Jabalpur - Mandala - Chilpi section from km 3/4 to km 192.400 of NH-12A in the State of Madhya Pradesh on DBFOT basis under NHDP - IV
Toll Road · ends 2039
Two laning with paved shoulder of Muzaffarpur Sanbarsa section of NH 77 in the State of Bihar
Toll Road · ends 2035
Two laning with paved shoulder of Tindivam Krishnagiri section of NH 66 from km 38.150 to km 214 in the state of Tamil Nadu
Toll Road · ends 2035
Two laning with paved shoulders Kamalanagar - Gunalli Road (Package 2) via Halburga and Bida from km 0.000 to km 70.000 of SH4 and link road of 5 km connecting SH-4 and SH-105 section under DBFOT
Toll Road · ends 2037
Two laning with paved shoulders of Jhansi-Khajuraho section of NH 75 from km 1.900 to km 169.950 in the State of UP and MP under NHDP III on BOT (Toll) basis
Toll Road · ends 2035
Two laning with paved shoulders of Nagaur-Bikaner section of NH-89 from km 171/00 to km 267/325 of NH 89 (including bypass at Nagaur from km 180/500 of NH-65 to km 171/00 of NH-89) in the state of Rajasthan under NH (Others) with implementation of th
Toll Road
Two laning with paved shoulders of Nagaur-Bikaner section of NH-89 from km 171/00 to km 267/325 of NH 89 (including bypass at Nagaur from km 180/500 of NH-65 to km 171/00 of NH-89) in the state of Rajasthan under NH (Others) with implementation of the pro
Toll Road · ends 2037
Two laning with paved shoulders of Raibarelly-Jaunpur Section of NH-231 from Km 0.000 to Km 166.4 in the state of Uttar Pradesh under NHDP - IV on BoT (Annuity) basis.
Toll Road · ends 2037
Two laning with paved shoulders, Devanahalli (km 0.000) to Kolar (km 49.052) via Vijayapura and Vemgal of SH-96 section under DBFOT
Toll Road · ends 2037
Two laning with paved shoulders, Gotur - Kagewad sections of SH-44 (km 0.00 to km 3.12) and SH-53 (km 2.30 to 0.0 under DBFOT
Toll Road · ends 2037
Two laning with paved side shoulder Bagepally - Bangapet - Kolar - Chelur Stretch (sections of chainage; KGF with Bangarpet from km 0.00 to km 11.40 of SH-95, Bangarpet with Bagepally, km 0.00 to 106.70 of SH-05 and Chintamani to Bagepalli via Chellur,
Toll Road · ends 2037
Two laning with paved side shoulder for Rayya to Khara section form Ch. 420.50 of NH-1 to junction of Canal Road with NH-15 (Harike - Amritsar Road) under DBFOT
Toll Road · ends 2037
Two laning with paved side shoulder for Tanda - Sri Hargobindpur - Amritsar Raod (SH-22) from km 0.000 to km 72.147 under DBFOT
Toll Road · ends 2037
Two laning with paved side shoulders (PSS) of Sindhanur to Lingsugur Road of SH 19 section
Toll Road · ends 2037
Two laning with PSS a section, between Kerala Border to Kollegal section of NH-212 in the state of Karnataka on BOT (Toll) basis under NHDP-IV
Toll Road · ends 2038
Two laning with PSS of Batala-Mehta-Beas Road to on MDR-66 Road on BOT (Toll)
Toll Road · ends 2036
Two laning with PSS of Guna-Ashoknagar-Ishagarh Project (SH 20) on BOT (toll) basis
Toll Road
Two laning with PSS of Kotkapura to Muktsar Road to on SH-16 Road on BOT (Toll)
Toll Road · ends 2036
Two laning with PSS of Nidampur (from NH-64) to Sullar Gharat to Lehra Ghagga (till NH-71) Road on BOT (Toll)
Toll Road · ends 2036
Two laning Z-Morh Tunnel section of NH-I on BOT (Annuity) in Sonamarg, Srinagar, Jammu and Kashmir
Toll Road · ends 2037
Two laningof Bikaner to Suratgarh section on NH 11 under VGF Scheme, length 172.384 km
Toll Road · ends 2036
Two-lane with Paved shoulder from Basnaghat (Morigaon) to Bhuragaon (in Darrang district) including new 2 lane Major Bridge over river Brahmaputra in the State of Assam on HAM
Toll Road
Two-laning with granular shoulders of Dhar-Nagda section of SH -31 from km 0.0 to km 22.6 under DBFOT (Toll)
Toll Road · ends 2037
Two-laning with Paved Side Shoulder (PSS) of Bihta-\nMahabalipur-Aurangabad section of SH-2 & NH-98
Toll Road · ends 2037
Two-laning with paved side shoulder in Northern Kota Bypass
Toll Road · ends 2037
Two-laning with Paved Side Shoulders of Nagaur-Jodhpur section of NH-65 from km 166.26 to km 296.07 in the State of Rajasthan under NH (O) on DBFOT (Toll) basis.
Toll Road · ends 2037
Two-laning with PSS of Nagaur-Jodhpur section of NH -65
Toll Road · ends 2037
Two-laning with PSS of Salasar to Haryana border, section of NH-65 from km 154.141 to km 0 and capacity augmentation in 2021 for four laning in the State of Rajasthan under NHDP IV on BOT (Toll) basis
Toll Road · ends 2037
Two-laning with PSS of Tembhurni-Kurduwali-Barshi-Yedshi-Latur Road section of SH-77 from km. 70.20 to km. 159.30 under DBFOT
Toll Road · ends 2037
Two-laning with PSS section, between Bijapur, Gulbarga, Homnabad section of NH 218 from Km 195.000 to Km 418.000 in the State of Karnataka on BOT (Toll)
Toll Road · ends 2037
Two/ Four laning of Bellary to AP Border section of SH 132 in Karnataka on BOT (Toll) basis
Toll Road · ends 2032
Two/ four laning of Obedullaganj -Shahganj Junction, Budhni- Betul Section of NH 69 under NHDP-IV, length 121.36 km
Toll Road · ends 2036
Two/four laning of Birmitrapur to Barkote section of NH 23 under NHDP Phase IV, length 125.615 km
Toll Road · ends 2036
Two/Four laning of Chandwad - Manmad- Nandgaon Road section of SH-24 from km. 0.000 to km 47.200 and km 0.000 to km 16.900 of SH-16 alongwith consruction of Manmad and Nandgaon by-pass under DBFOT
Toll Road · ends 2037
Two/Four laning of Nanded-Narsi Road section to Narsi -Degloor section of SH-6
Toll Road
Two/Four laning of Nanded-Narsi Road sector of SH-6
Toll Road · ends 2034
Two/Four laning of NH 12 from km 256.550 to km 346.539 (Kota-Jhalwar section) in the State of Rajasthan under NHDP Phase III on BOT(Toll) basis basis
Toll Road · ends 2036
Udaipur - Rajasthan NH-8 Toll Road Expansion
Toll Road · ends 2038
Udaipur Shamlaji NH8 BOT Concession
Toll Road · ends 2043
Udaipur Tollway Limited
Toll Road
Udaipur Tollway Limited (UTL) Concession
Toll Road · ends 2035
Ujjawala Solar Power Project
Energy Generation · ends 2040
Umari Phook Pratapur State Highway
Toll Road · ends 2042
Una - Kodinar road
Toll Road · ends 2031
Unison Enviro Chitradurga-Davanagere GA (Karnataka)
Gas Distribution
Unison Enviro Latur-Osmanabad GA (Maharashtra)
Gas Distribution
UNOSUGEN Gas Power Plant
Energy Generation · ends 2036
Up-gradation of existing facilities of OB-1, OB-2 at Outer Harbour (OH) and WQ-1 Berth at Inner Harbour (IH) of Visakhapatnam Port for handling iron ore cargo on DBFOT basis
Port · ends 2043
Upgradation of Bhilwara to Bundi State Highway, Rajasthan
Toll Road · ends 2034
Upgradation of Churu-Bhaleri Road
Toll Road
Upgradation of Jaipur to Bhilwara State Highway, Rajasthan
Toll Road · ends 2034
Upgradation of Jaipur to Nagaur State Highway in Rajasthan
Toll Road · ends 2035
Upgradation of Narnaul to Kotputli- Chala- Sikar-Khud- Losal-\nKuchaman State Highway
Toll Road · ends 2036
Upgradation of Sawai Madhopur to Bharatpur State Highway in Rajasthan
Toll Road · ends 2035
Upgrade to 4-lane of section Rewari-Ateli Mandi, part of NH-11
Toll Road · ends 2037
Upgrade to 8-Laning of section Vadape to Thane part of NH-3
Toll Road · ends 2033
Upper Khauli Power Project
Energy Generation · ends 2046
VA Tech - HAM Projects
Toll Road · ends 2040
Vaayu India Power Corporation Ltd
Energy Generation · ends 2035
Vaayu Renewable Energy (Mahanadi) Private Limited
Energy Generation · ends 2037
Vadhavan Port (Maharashtra)
Port
Vadodara - Halol Toll Road
Toll Road · ends 2029
Vadodara Gas Limited Vadodara GA (Gujarat)
Gas Distribution
Vadodara Gas Ltd GA
Gas Distribution
Vadodara-Mumbai Expressway
Toll Road
Valecha Badwani Sendhwa Tollways Limited
Toll Road · ends 2026
Valecha Kachchh Toll Road Limited
Toll Road · ends 2031
Valecha LM Toll Private Limited
Toll Road · ends 2035
Vallarpadam International Container Transhipment Terminal - Phase I
Port · ends 2044
Varanasi - Ranchi - Kolkata highway (Package 2)
Toll Road · ends 2038
Varanasi - Ranchi - Kolkata highway (Package 3)
Toll Road · ends 2038
Varanasi - Ranchi - Kolkata highway (Package 6)
Toll Road · ends 2038
Varanasi Airport PPP Lease (NMP-II)
Airport
Varanasi Aurangabad NH-2 Tollway
Toll Road · ends 2054
Varanasi Ropeway Pilot Project
Toll Road · ends 2035
Varanasi Solid Waste Management
Waste Management
Vayu Urja Bharat Wind Farm
Energy Generation · ends 2042
VCT II
Port · ends 2049
Vengalem-Kuttipuram NH17 Road
Toll Road · ends 2033
Venkatamangalam Waste-to-Energy plant
Waste Management · ends 2033
Videocon Jodhpur Solar Plant
Energy Generation · ends 2036
Videocon Warora Solar Plant
Energy Generation · ends 2036
1
2
22
Page 23
24
All countries and sectors →