Concessio
Infrastructure Intelligence
Browse
Docs
App
Concessio Registry · Sector directory
Toll Road concessions
3,450 tracked Toll Road concession records worldwide, 26 published with verified detail. Each resolves a canonical Concessio ID. Page 10 of 35.
Construction and Upgradation of NH-131A from Km. 34.578 near Narenpur to Km. 81.000 near Purnea to 4 Lane standard in thew State of Bihar on Hybrid Annuity Model under NH(0) Funding (Package II)
India · ends 2041
Construction of 2-Lane Major Bridge across River Gandak along with its both side approaches connecƟng Manuapul (Beƫah on NH-727) in Bihar at Km 0.00 and Tiwaripaƫ (Sewarhi on NH-730) in UƩar Pradesh at Km. 29+248 of NH-727AA
India
Construction of 4 -Lane Highways from Barabanki-Mustabad -Bahraich corridor in the State of Uttar Pradesh on HAM Mode
India
Construction of 4 Lane Greenfield section from Mokama to Munger of NH-33 in the State of Bihar on Hybrid Annuity Mode.
India
Construction of 4 laning of Sahebganj Areraj Bettiah of NH-139W with Spur connectivity to Maker of (96.726 km) in the State of Bihar on HAM Mode comprising of (i) Package1: - Sahebganj to Areraj (38.362 km) and (ii) Package 2: - Areraj to Bettiah (40
India
Construction of 4-Lane Greenfield Expressway from Patna to Purnea (NE-9) in the State of Bihar on Hybrid Annuity Mode (HAM) under NH(O).
India
Construction of 4-Lane Highway from Baihata Chariali (Km 0+000), near Guwahati to Tezpur (Km 135+000) & excluding Mangaldoi Bypass (from Km 28+500 to 42+590) along NH-15 in the State of Assam in HAM mode.
India
Construction of 4-Lane Thiruvananthapuram Outer Ring Road (ORR) from Navaikulam (Ch. 0+00) to Vizhinjam (Ch. 62+70) section of NH-866 in Kerala on BOT Mode.
India
Construction of 4-Lanning of Badnawar-Petlawad-Thandla-Timarwani section of (NH-752D) in the state of Madhya Pradesh on Hybrid Annuity Mode under NH(O)” in two package.
India
Construction of 4/6 lane access-controlled Kanpur-Kabrai greenfield highway in the State of Uttar Pradesh under NH(O) scheme on BOT(Toll)
India
Construction of 6-lane Greenfield Varanasi–Ranchi–Kolkata Highway from Konki Village to Lerua Village from Km 0+000 to Km 41+955 under NH (O) in the State of Bihar on Hybrid Annuity Mode.
India
Construction of Access Controlled Highway of 4-Lane with Paved Shoulders from Ranganathpura (Hassan) to Keresooragondanahalli in Hassan Hiriyur section (EC-20) in Karnataka on HAM under NH (O).
India
Construction of Access Controlled Highways from Km. 10/0 to Km. 29/5 of Bangolore section of NH-4 in the state of Karnataka on BOT basis
India · ends 2031
Construction of Bridge across Krishna river connecting Puligadda and Penumudi
India · ends 2035
Construction of Bridge across Krishna river Godavari at km 82/4 of Eluru Gundugolanu Kovvur Road
India · ends 2035
Construction of Bridge across river Godavari
India · ends 2033
Construction of Coastal Highway (Rameswar - Paradeep)- i. Construction of 4-lane Access Controlled Coastal Highway from Rameshwar to Konark (km.0 to km. 79.400) on Hybrid Annuity Mode in the State of Odisha (Package-I). ii. Construction of new 2-lane
India
Construction of Elevated Six Lane Highway (Flyover) from Km.16,100 (In Delhi) to Km.20.500 (Haryana) and its approaches on NH-2 (Delhi Agra Section) on BOT basis.
India · ends 2031
Construction of Four-lane Bhopal By-pass in Madhya Pradesh
India · ends 2032
Construction of green field bridge across river Ganga connecting Bakhtiyarpur
India · ends 2035
Construction of Greenfield Connectivity to Jewar International Airport from DND- Faridabad- Ballabhgarh Bypass KMP Link -Spur to Delhi Mumbai Expressway on Hybrid Annuity Mode under Bharatmala Pariyojana in the state of Uttar Pradesh & Haryana. (Desi
India
Construction of Guwahati Ring Road in the state of Assam on DBFOT (Toll)
India
Construction of new bridges and operation and maintenance of four-laned road of the Baleshwar-Kharagpur section of NH-60 from km 0.00 to km 119.30 on BOT (Toll) basis
India · ends 2036
Construction of new four lane connecting Lebad to Manpur
India · ends 2034
Construction of New Link (NH-133B) from Km. 0.000 (Km. 200.87 of Sahibganj Bypass) in Jharkhand to Km. 15.885 (Junction of NH-133B and 131A on Manihanri Bypass) and construction of Manihari Bypass from Km. 0.000 (Junction of NH-133B and 131A on Manih
India
Construction of New Link (NH-133B) from Km. 0.000 (Km. 200.87 of Sahibganj Bypass) in Jharkhand to Km. 15.885 (Junction of NH-133B and 131A on Manihanri Bypass) and construction of Manihari Bypass from Km. 0.000 (Junction of NH-133B and 131A on Manihari Bypass) to Km. 6.000 near Naranpur of NH-131A in the State of Bihar including 4 Lane Ganga Bridge on Hybrid Annuity Mode under NH(0) funding (Package I)
India · ends 2041
Construction of New Link (NH-133B) from Km. 0.000 (Km. 200.87 of Sahibganj Bypass) in Jharkhand to Km. 15.885 (Junction of NH-133B and 131A on Manihanri Bypass) and construction of Manihari Bypass from Km. 0.000 (Junction of NH-133B and 131A on Manihari Bypass) to Km. 6.000 near Naranpur of NH-131A in the State of Bihar including 4 Lane Ganga Bridge on Hybrid Annuity Mode under NH(0thers)
India · ends 2041
Construction of Northern Ayodhya Bypass (NAB) and Southern Ayodhya Bypass (SAB) with total length of 67.572 kms on HAM in the State of Uttar Pradesh
India
Construction of Road Tunnel with its approaches from Shiv Murti Interchange on NH-248BB/NH-48 to Nelson Mandela Marg (NH-148AE) in the State of Delhi on HAM mode (Ch. 0+000 to 4+974)” by Ministry of Road Transport & Highways (MoRTH) under PPP mode.
India
Construction of Six lane access-controlled Greenfield Expressway from Km 0.000 to Km 213.803 (Tharad to Ahmedabad-Design length 213.803 km) in 6 packages under Bharatmala Pariyojana in the State of Gujarat on Hybrid Annuity Mode.
India
Construction of Six Lane Elevated Road Along with Six Lane At-Grade Road with Service Road in Anisabad–Deedargunj Section in the State of Bihar on Hybrid Annuity Mode.
India
Construction of three (3) km long three (3) lane flyover (Elevated Corridor) near Joda town inluding improvement of road stretch of Joda - Bamberi Section between 0 to 4.875 KM. in the District of Kendujhar, Odisha under PPP mode on DBFOT (Toll) Basis - Length 4.875 KM
India · ends 2042
Consultation nº 3654 — base navale de Brest — refonte de la station de pompage des bassins 4 et 7 (SALOU) — marché de conception — construction — aménagement — entretien — maintenance
France · ends 2045
Contournement Nimes - Montpellier
France · ends 2037
Contract concesionarea prin gestiune delegată a serviciului de iluminat public din municipiul Buzău
Romania · ends 2045
Contract de delegare a gestiunii, prin concesionare, a Serviciului de Iluminat Public din municipiul Bistrița și localitățile componente
Romania · ends 2046
Contract de delegare prin concesiune a serviciului de intretinere si reparatii a sistemului de iluminat public din orasul Insuratei
Romania · ends 2046
Córdoba - Sucre
Colombia · ends 2035
Cordoba Toll Road Project
Argentina · ends 2023
CÓRDOBA-VERACRUZ
Mexico
Corredor Cordobes
Argentina · ends 2038
Corredor de Los Andes
Panama
Corredor de Transporte Público Ruta 160
Chile · ends 2035
Corredor Girardot-Honda-Puerto Salgar
Colombia · ends 2039
Corredor Marechal Rondon Oeste
Brazil · ends 2050
Corredor Sur toll Road Project
Panama · ends 2023
Corredor Vial Integrado del Atlantico
Argentina · ends 2041
Corredor Vial N 2
Argentina
Corredor Vial N 3
Argentina
Corredor Vial N 4
Argentina · ends 2016
Corredor Vial N 5
Argentina
Corredor Vial N 6
Argentina
Corredor Vial N 7
Argentina
Corredor Vial N 8
Argentina · ends 2020
Corredor Vial N. 1
Argentina
Corredores de Transporte Público Ruta 150 y Autopista Concepción-Talcahuano Tramo II
Chile · ends 2035
Costa Da Prata Motorway
Portugal · ends 2025
Costa Sierra Section 1B
Peru · ends 2022
Costa Sierra: Ovalo-Chancay-Huaral-Acos Stretch
Peru · ends 2024
Costanera Norte Santiago
Chile · ends 2033
Costanera Sur de Asuncion Road
Paraguay · ends 2046
Cotia - Sorocaba Toll Road
Brazil · ends 2023
Cross City Tunnel
Australia
Cross City Tunnel Sydney
Australia · ends 2035
Cross Israel Highway (Highway 6)
Israel · ends 2029
Cross-River Bridge in Yuxi City, Yuanjiang County
China · ends 2039
Cross-river tunnel project of Songshan Road
China · ends 2043
Cruce internacional San Luís Río Colorado II
Mexico · ends 2037
CUACNOPALAN-OAXACA
Mexico
Cube Highways
India · ends 2039
Cube Invit
India · ends 2047
CUERNAVACA-ACAPULCO
Mexico
CVU Highway Program
Uruguay · ends 2051
D3 - Deviation de Troissereux (French Road) Concession
France · ends 2035
D35 Motorway PPP Section Selection
Czech Republic
D4 Highway Czech Republic PPP (Via Salis)
Czech Republic
D4 Motorway Písek-Tábor PPP Czech
Czech Republic · ends 2046
D4 Skalka-Mirotice Extension
Czech Republic · ends 2049
D4/R7 Bratislava Bypass PPP
Slovakia · ends 2046
D4/R7 Highway PPP project
Slovakia
D4/R7 Motorway
Slovakia · ends 2041
D4R7 Slovakia PPP
Slovakia · ends 2050
Daang Hari-SLEX Link Road
Philippines · ends 2043
Daegu-Busan Expressway
South Korea · ends 2031
Daguangnan Expressway
China · ends 2035
Dakaimen - Yushang Expressway
China · ends 2051
Dakar Diamniadio Toll Road
Senegal · ends 2039
Dakar-AIBD Airport Toll Extension
Senegal · ends 2044
Dakar-Diamniadio Toll Highway (Section 1)
Senegal · ends 2039
Dakar-Diamniadio Toll Road Extension
Senegal · ends 2040
Dali section of Nanxun to Jingdong Expressway
China · ends 2049
Damansara-Puchong Highway
Malaysia · ends 2029
Damansara-Shah Alam Elevated Expressway (DASH)
Malaysia · ends 2070
Damoh- Jabalpur Road Project
India · ends 2034
Dangiywas - Jajiwal section of Jodhpur Ring Road
India · ends 2033
Dartford Crossing (incl. QE2 Bridge & Tunnels)
United Kingdom · ends 2039
Datia Bhander Highway Project
India · ends 2027
Dausa - Lalsot - Kauthun section of NH-11 A
India · ends 2035
Daye City Road Project
China
DBL Ashoknagar Vidisha Tollways Limited
India · ends 2028
1
2
9
Page 10
11
34
35
All countries and sectors →