Concessio
Infrastructure Intelligence
Browse
Docs
App
Concessio Registry · Country directory
Infrastructure concessions in India
2,394 tracked concessions in India, 1 published with verified detail. Each resolves a canonical Concessio ID. Page 21 of 24.
Six Laning of Gorhar to Kharratunda Sector of NH-2
Toll Road · ends 2036
Six Laning of Gurgaon-Kotputli-Jaipur Section of NH-8 in Haryana/Rajasthan on BOT (Toll) basis following by DBFO pattern.
Toll Road · ends 2032
Six Laning of Handia Varanasi Section of NH-2 from KM 713.146 to KM 785.544 in the State of Uttar Pradesh under NHDP Phase V on Hybrid Annuity Mode
Toll Road · ends 2041
Six laning of Handia- Varanasi from km 713.146 to km 785.544 under NHDP-V
Toll Road · ends 2039
Six laning of Indore-Dewas section of NH 3 from Km 577.55 to km 610.00 and Km 0.00 to Km 12.60 in the State of MP under NHDP V on BOT basis
Toll Road · ends 2033
Six Laning of Kharar to Ludhiana Section of NH - 95 (New NH - 05) from Kharar Km. 10+185 to Samrala Chowk Ludhiana Km. 86+199 in the State of Punjab under NHDP Phase V on Hybrid Annuity Mode
Toll Road · ends 2041
Six laning of Kishangarh -Udaipur- Ahmedabad section of NH 79A, NH79, NH 76 and NH 8 under NHDP Phase V, length 555.50 km
Toll Road · ends 2036
Six Laning of Kishangarh-Ajmer-Beawar Section from KM 364.125 to KM 58.245 of NH 8 on BOT Basis
Toll Road · ends 2033
Six laning of Krishnagiri-Walahjpet section of NH 46 from Km 0 to km 148.30 in the State of Tamil Nadu under NHDP V on BOT basis
Toll Road · ends 2033
Six laning of NH 4 from Tumkur to Chitradurga in Karnataka under NHDP Phase V on BOT (Toll) on DBFO pattern
Toll Road · ends 2034
Six laning of NH7 from Hosur to Krishnagiri on NH93 in Tamil Nadu
Toll Road · ends 2035
Six laning of Nidagatta-Mysore section of NH-275 from km 74.20 to km 135.304 in the state of Karnataka on Hybrid Annuity mode (Package-II)
Toll Road · ends 2042
Six Laning of Panipat - Jalandhar Section of NH-1 (291 Km) in Haryana and Punjab.
Toll Road · ends 2032
Six Laning of Pimpalgaon-Nashik-Gonde section of NH-3 in the State of Maharashtra under NHDP Phase IIIA on BOT basis.
Toll Road · ends 2032
Six laning of Poonamallee-Walajapet section of NH 4 under NHDP V on BOT(Toll) basis
Toll Road · ends 2035
Six laning of Pune-Satara section of NH 4 from km 725 to km 865.35 in the State of Maharashtra under NHDP Phase V on BOT (Toll) basis on DBFO pattern
Toll Road · ends 2034
Six laning of Samakhiali-Gandhidham section of NH 8A from km 306 to km 362.16 in the State of Gujarat under NHDP Phase V on BOT (Toll) basis on DBFO pattern
Toll Road · ends 2034
Six Laning of Surat-Dahisar Section of NH-8 (239 Km) in Gujarat and Maharashtra
Toll Road · ends 2032
Six Laning of Vadakkancherry to Thrissur Section (Package No.NS-2/BOT/KL-3
Toll Road · ends 2032
Six laning of Varanasi-Aurangabad section of NH 2from Km 786.00 to km 978.40 in the State of UP/Bihar under NHDP V on BOT basis
Toll Road · ends 2033
Six-lane Access Control Greenfield Capital Region Ring Road (Bhubaneswar Bypass) from Rameshwar to Tangi in the State of Odisha on HAM
Toll Road
Six-lane expressway of Mumbai-Trans-Harbour-Link (MTHL) connecting Sewri on Mumbai Island
Toll Road · ends 2037
Six-Lane Greenfield Highway from Pagote to Chowk of NH 348B in Maharashtra on Built Operate Transfer (BOT) mode.
Toll Road
Six-lane Zirakpur Bypass in the state of Punjab & Haryana on Hybrid Annuity Mode
Toll Road
Six-laning of Aurangabad-Barwa Adda Section of NH-2 from Km 180.000 to 398.750 in the State of Bihar and Jharkhand under NHDP Phase-V on BOT (Toll) basis.
Toll Road · ends 2037
Six-laning of Gundugolanu - Rajahmundry section of NH-5 from km 1022.494 to km 901.753 in the State of Andhra Pradesh under NHDP Phase V on BOT (Toll) basis.
Toll Road · ends 2037
Six-laning of Vijayawada-Gundugolanu section of NH-5 section from km 1076.48.00 to km 1022.48 under NHDP Phase V on BOT (Toll) basis:
Toll Road · ends 2036
Six/ Eight laning of JNPT Port Road Project ofn Mumbai JNPT Port Road Company Ltd. (MJPRCL) from km 3.60 to km 27.27 at NH 4B (A1 - E section), km 0.0 to km 4.492 at NH-4B (D-G section), km 5.3 to km 14. 85 on SH-54 and km 0.000 to km 6.200 on Amra M
Toll Road
Six/ Eight laning of JNPT Port Road Project ofn Mumbai JNPT Port Road Company Ltd. (MJPRCL) from km 3.60 to km 27.27 at NH 4B (A1 - E section), km 0.0 to km 4.492 at NH-4B (D-G section), km 5.3 to km 14. 85 on SH-54 and km 0.000 to km 6.200 on Amra Marg
Toll Road · ends 2038
Six/Four Laning of Delhi - Haryana Border to Rohtak Section of NH-10 from Km 29.70 to Km 87.00 including construction of Bahadurgarh and Rohtak Bypasses in Haryana under NHDP Phase IIIA
Toll Road · ends 2031
Six/Four Laning of Zirakpur - Parwanoo section of NH-22 including Pinjore - Kalka - Parwanoo bypass in Punjab, Haryana and Himachal Pradesh under NHDP Phase III A
Toll Road · ends 2031
SLREPL 25 MW Banskantha Solar Project
Energy Generation · ends 2037
Smart metering
Energy Generation · ends 2040
Solairedirect Vijaypur Solar
Energy Generation · ends 2043
Solapur Bijapur Tollway Private Limited
Toll Road · ends 2032
Solapur Yedeshi Tollway Private Limited
Toll Road · ends 2043
Solar Semiconductor Power Company (India) Private Limited
Energy Generation · ends 2037
Solarfield Energy Two Private Limited
Energy Generation · ends 2038
Solid Waste Management Plant WSM processing plant at Sewapura, Jaipur
Water · ends 2035
Solid Waste Treatment Plant at village Langariwas, Jaipur
Water · ends 2035
Soma Isolux Kishangarh Beawar Tollway Limited
Toll Road · ends 2027
Soma Isolux Varanasi Aurangabad Tollway Private Limited
Toll Road · ends 2041
Soma Jabalpur Rewa Tollway Private Limited
Toll Road · ends 2036
Soma-Isolux NH One Tollway Private Limited
Toll Road · ends 2023
Sonauli-Gorakhpur section of NH-29E concession
Toll Road · ends 2038
Sonna Mini Hydel Scheme
Energy Generation · ends 2033
Sonsoddo Solid Waste Management Facility
Waste Management · ends 2036
Sonthalia Naukh Solar Plant
Energy Generation · ends 2036
Sorang Hydro Power project
Energy Generation · ends 2046
Soubhagya Hata Darguwan Projects Private Limited
Toll Road · ends 2026
South East UP Power Transmission Company Limited
Transmission · ends 2049
SP Jammu Udhampur Highway Private Limited
Toll Road · ends 2031
Spanco Nagpur Discom Limited
Power Distribution · ends 2026
Sri Guru Ram Dass Jee Airport Amritsar
Airport · ends 2038
Sriganganagar - Bikaner (Padampur - Raisinghnagar & Sattasar - Bikaner),.
Toll Road · ends 2035
Sriganganar-Padampur- Raisingh Nagar-Anupgarh Road.
Toll Road · ends 2035
Sriganganar–Padampur-Raisinghnagar–Anupgarh State Highway
Toll Road · ends 2024
Srinagar Banihal Expressway Limited
Toll Road · ends 2031
Srinagar Sonamarg Tunnelway Limited
Toll Road · ends 2034
Srinagar to banihal section of NH 1A from km 187 to km 189.350, km 270.700 to km 286.110 and 187 to 220.700 on DBFOT (Annuity) in the State of Jammu and Kashmir
Toll Road · ends 2034
Sterlite Power India Transmission Bond
Power Distribution
Strengthening and widening of Sarkhej Bhavanagar highway
Toll Road · ends 2034
Strengthening and Widening of two lane road with paved\nshoulders of Bhuj - Bachau Section of SH-42 in the State of\nGujarat
Toll Road · ends 2033
Strengthening of Chandpur-Alirajpur-Kukshi-Badwani State Highways in Madhya Pradesh
Toll Road · ends 2031
Strengthening of Mandsaur-Sitamau Road (Upto Rajasthan Border) State Highway in Madhya Pradesh
Toll Road · ends 2031
Strengthening of Matkuli-Tamia-Chindwara State Highways in Madhya Pradesh
Toll Road · ends 2031
SU Toll Road Private Limited
Toll Road · ends 2032
Sun Charanka Solar Plant
Energy Generation · ends 2036
Sun Edison Rooftop Solar Project_2.5MW
Energy Generation · ends 2038
Sunborne Energy Rajasthan Solar Private Limited
Energy Generation · ends 2037
SunBorne Karmaria I & II Solar Plant
Energy Generation · ends 2036
Supreme Manor Wada Bhiwandi Infrastructure Pvt Ltd
Toll Road · ends 2032
Supreme Panvel Indapur Tollways Private Limited
Toll Road · ends 2032
Surat-Dahisar NH 8
Toll Road · ends 2022
Suratgarh Bikaner Toll Road Company Private Limited
Toll Road · ends 2028
Suratgarh Sriganganagar Toll Road Private Limited
Toll Road · ends 2023
Surya Vidyut Limited
Energy Generation · ends 2039
Suryachakra Power Bamboo Flat
Energy Generation · ends 2025
Suryoday Solar Plant
Energy Generation · ends 2042
Sushee IVRCL Arunachal Highways Limited
Toll Road · ends 2029
Sx laning of Anandapuram - Pendurthi - Anakapalli section of NH 5 (New NH-16) from KM 681 to KM 731.78 alongwith fourlane connectivity to Visakhapatnam Port Road from KM 0 to KM 12.7 in Andhra Pradesh on Hybrid Annuity Mode
Toll Road · ends 2042
Tada Nellore & Vijaywada Nadigama Highway
Toll Road · ends 2032
Tadas Wind Energy Limited
Energy Generation · ends 2037
Tala Transmision
Energy Generation · ends 2033
Talaja - Mahuva NH-8E Highway Expansion
Toll Road · ends 2035
Talegaon-Amravati NH 6
Toll Road · ends 2031
Talwandi Sabo Power Limited
Energy Generation · ends 2034
Tambaram-Pallavapuram Solid Waste Management Project
Waste Management · ends 2033
Tamil Nadu HVDC Transmission (IndiGrid 2024)
Transmission · ends 2059
Tamil Nadu Solar Plant
Energy Generation · ends 2040
Tamil Nadu Wind Farm Phase 1
Energy Generation · ends 2042
Tanir Bavi Power Company
Energy Generation · ends 2025
Tantia Batala Beas Tollways Private Limited
Toll Road · ends 2037
Tantia Raxaul Tollway Private Limited
Toll Road · ends 2031
Tarsod to Fagne Section of NH6
Toll Road · ends 2033
TATA Mithapur Solar Plant
Energy Generation · ends 2036
Tata Power Dalot Windfarm
Energy Generation · ends 2038
Tata Power Delhi Distribution (TPDDL)
Power Distribution · ends 2027
Tata Power Mumbai Distribution
Power Distribution · ends 2039
Tata Power Pethshivpur Windfarm
Energy Generation · ends 2027
1
2
20
Page 21
22
23
24
All countries and sectors →