Concessio
Infrastructure Intelligence
Browse
Docs
App
Concessio Registry · Country directory
Infrastructure concessions in India
2,394 tracked concessions in India, 1 published with verified detail. Each resolves a canonical Concessio ID. Page 5 of 24.
Construction of Six lane access-controlled Greenfield Expressway from Km 0.000 to Km 213.803 (Tharad to Ahmedabad-Design length 213.803 km) in 6 packages under Bharatmala Pariyojana in the State of Gujarat on Hybrid Annuity Mode.
Toll Road
Construction of Six Lane Elevated Road Along with Six Lane At-Grade Road with Service Road in Anisabad–Deedargunj Section in the State of Bihar on Hybrid Annuity Mode.
Toll Road
Construction of three (3) km long three (3) lane flyover (Elevated Corridor) near Joda town inluding improvement of road stretch of Joda - Bamberi Section between 0 to 4.875 KM. in the District of Kendujhar, Odisha under PPP mode on DBFOT (Toll) Basis - Length 4.875 KM
Toll Road · ends 2042
Construction, Development, Financing Operation and Maintenance of Students Hostel in campus of Indian Institute of Information Technology (IIIT) - Nagpur on DBFOT under PPP Mode.
Social Infrastructure
Continental Warehousing Corporation (Nhava Seva) Limited
Port · ends 2036
Continuum Green
Energy Generation · ends 2051
Cube Highways
Toll Road · ends 2039
Cube Invit
Toll Road · ends 2047
CUGL Bareilly GA
Gas Distribution
CUGL Jhansi GA
Gas Distribution
CUGL Kanpur GA
Gas Distribution
Cuttack Municipal Solid Waste Management Project
Waste Management · ends 2034
Dahanu Solar Power Private Limited
Energy Generation · ends 2036
Dahej Liquid Chemical Port
Port · ends 2029
Dahej LNG Terminal
Gas Distribution · ends 2035
Dahisar 20MW Solar Power Plant_PLG Power
Energy Generation · ends 2035
Dakshin Bharat Gateway Terminal Private Limited
Port · ends 2043
Damoh- Jabalpur Road Project
Toll Road · ends 2034
Dangiywas - Jajiwal section of Jodhpur Ring Road
Toll Road · ends 2033
Datia Bhander Highway Project
Toll Road · ends 2027
Dausa - Lalsot - Kauthun section of NH-11 A
Toll Road · ends 2035
Davanagere Drinking water services
Water · ends 2030
DB Power Limited (Chattisgarh)
Energy Generation · ends 2036
DBL Ashoknagar Vidisha Tollways Limited
Toll Road · ends 2028
DBL Bankhlafata Dogawa Tollways Limited
Toll Road · ends 2028
DBL Betul Sarni Tollways Limited
Toll Road · ends 2029
DBL Jaora-Sailana Tollways Limited
Toll Road · ends 2028
DBL Mundi Sanawad Tollways Limited
Toll Road · ends 2026
DBL Nadiad Modasa Tollways Limited
Toll Road · ends 2026
DBL Sardarpur Badnawar Tollways Limited
Toll Road · ends 2026
DBL Silwani Sultanganj Tollways Limited
Toll Road · ends 2026
DBL Sitamau Suwasara Tollways Limited
Toll Road · ends 2026
DBL Uchera-Nagod Tollways Limited
Toll Road · ends 2028
Deendayal Port Kandla
Port · ends 2040
Deepening and Optimization of Paradip Port Trust (PPT) Inner Harbour Facilities including construction of Western Dock Captive Berths to handle capesize vessels on PPP mode
Port · ends 2049
Dehar and Upper Awa SHPs
Energy Generation · ends 2029
Dehradun Highways Project Limited (DHPL)
Toll Road
Dehradun Solid waste Collection, Composting and Landfill
Waste Management · ends 2031
Delhi - Meerut Expressway and other connecting roads including 6/8 laning of NH-24 from km 0.000 to km 49.23, NH-58 from km 6.800 to km52.528 and NH-235 from km 0.360 to km 8.800 on DBFOT (Toll) basis in the State of Delhi and Uttar Pradesh (Total Le
Toll Road
Delhi - Meerut Expressway and other connecting roads including 6/8 laning of NH-24 from km 0.000 to km 49.23, NH-58 from km 6.800 to km52.528 and NH-235 from km 0.360 to km 8.800 on DBFOT (Toll) basis in the State of Delhi and Uttar Pradesh (Total Lengt
Toll Road · ends 2039
Delhi - Meerut Expressway Package I
Toll Road · ends 2031
Delhi - Meerut Expressway Package III
Toll Road · ends 2031
Delhi Agra Toll Road
Toll Road · ends 2041
Delhi IGI Airport (GMR-ADP)
Airport · ends 2036
Delhi Indira Gandhi International Airport Expansion
Airport · ends 2036
Delhi International Airport Limited (Indira Gandhi International Airport)
Airport
Delhi Kondli STP PPP (45 MLD)
Water · ends 2026
Delhi Okhla Waste-to-Energy
Waste Management · ends 2034
Delhi-Amritsar-Katra Expressway
Toll Road
Delhi-Mumbai Expressway
Toll Road · ends 2053
Delhi-Mumbai Expressway (Bandikui - Jaipur section)
Toll Road · ends 2039
Delhi-Mumbai Expressway (Haryana section)
Toll Road · ends 2053
Delhi-Mumbai Expressway (NE-4)
Toll Road
Delhi-Noida Bridge Project
Toll Road · ends 2028
Delhi’s Power Distribution Grid Enhancements and Battery Energy Storage System
Power Distribution · ends 2048
Deoli-Kanwas
Toll Road · ends 2035
Desalination Plant, Kasnau - Matasukh (Nagaur)
Energy Generation · ends 2040
Design Construction, Finance, Operation and maintenance of Hyderabad-Vijayawada section including Design, Engineering Finance, Construction of additional Two Laning/future Six Laning of NH 9 in the State of Andhra Pradesh (km 160 to km 221.5)
Toll Road · ends 2032
Design Construction, Finance, Operation and maintenance of Hyderabad-Vijayawada section including Design, Engineering Finance, Consttruction of additional Two Laning/future Six Laning of NH 9 in the State of Andhra Pradesh (km 40 to km 160)
Toll Road · ends 2032
Design Engineering, Construction, Development, Finance and Operation and maintenance of MP/Maharashtra Border Dhule section of NH 3
Toll Road · ends 2032
Design, Construction, Operation and Maintenance of Processing Facility based on Waste to Energy for MMSW at Vadodara Project.
Water · ends 2035
Design, Engineering, Construction, Finance and Maintenance of Jaipur Reengus section of NH 11
Toll Road · ends 2032
Design, Engineering, Finance, Construction, Operation and Maintenance of four laning of Bijapur-Hungund section of NH 13 from km 102 to km 202 in the State of Karnataka under NHDP Phase III through DBFOT basis
Toll Road · ends 2034
Design, Engineering, Finance, Construction, Operation and Maintenance of four laning of Bijapur-Hungund section of NH 13 from km 202 to km 299 in the State of Karnataka under NHDP Phase III through DBFOT basis
Toll Road · ends 2034
Design, Engineering, Upgradation, Development, Finance, Operation and Maintenance of Hyderabad-Bangalore section of NH 7 in the state of 12 under NHDP Phase VII
Toll Road · ends 2034
Developmen t of Major Harbour at Diglipur
Port · ends 2040
Development (Creation, Upgradation, Operation, Maintenance, and Utilisation) of BharatNet through PPP
Telecom
Development (four / two laning with PSS) of road from Shimoga- Honnalli to Hariharawad-Ramnagar, SH-34 ,
Toll Road · ends 2037
Development (Four laning) of Rajauli-Bakhtiyarpur section of NH-31 on BOT basis
Toll Road · ends 2037
Development and Maintenance of Land to be created in Offshore of Vadhvan Coast by Dredging, Reclamation & Construction of Offshore Protection Bund for Vadhvan Port on PPP to be executed on Hybrid Annuity Mode.
Port
Development and Operation of Bikaner to Suratgarh section on NH 11 from km 553.869 to km 173.000 on NH 15
Toll Road · ends 2036
Development and Operation of Chittorgarh-Neemach section of NH 79 and Nimbahera-Pratapgarh section of NH 113
Toll Road · ends 2036
Development and Operation of Suratgarh-Sriganganagar section of NH 15 in the State of Rajasthan
Toll Road · ends 2036
Development of 13th to 16th Multipurpose Cargo (other than Liquid/Container) Berths at Kandla Port basis
Port · ends 2036
Development of 4 lane access-controlled Economic Corridor from Kharagpur to Moregram Section Km 0.000 to Km 230.957 of NH 116A divided into 5 packages in the state of West Bengal under Bharatmala Pariyojana on HAM model
Toll Road
Development of 4-lane Access Controlled Marakkanam to Puducherry of NH332A in the State of Tamil Nadu under NH(O) on Hybrid Annuity Mode (Package - III).
Toll Road
Development of 4-lane Access Controlled Sirhind – Sehna section of NH205AG in the State of Punjab under NH(O) on Hybrid Annuity Mode (Package I & II)
Toll Road
Development of 4-lane access-controlled Pathalgaon-Kunkuri-CG/JH border-Gumla-Bharda section as part of Raipur-Dhanbad Economic Corridor under Bharatmala Pariyojana in the state of Chhattisgarh and Jharkhand on HAM model
Toll Road
Development of 400 kV Babai (Jhunjhunu) - Jaipur (North) Double Circuit Twin Moose Power Transmission line with a design capacity to transfer electricity equivelent to 1066 MW and having 2x315 MVA, 400/220 KV Grid substation at jaipur (North) project in R
Power Distribution · ends 2045
Development of 400 kV DCDS Sarni (Satpura)-Ashta transmission line project under DBFOT (Toll)
Energy Generation · ends 2042
Development of 400 kV Suratgarh-Bikaner Double Circuit of Super Critical Thermal Power Plant at Suratgarh
Power Distribution · ends 2045
Development of 4th Container at JNPT, Nhava Seva near Mumbai in the State of Maharashtra on DBFOT basis
Port · ends 2043
Development of 5 Star Eco Tourism Resort at Lalaji Bay, Long Island Andaman and Nicobar Inslands
Toll Road
Development of 5 Star Eco Tourism Resort at Shaheed, Dweep Island Andaman and Nicobar Inslands
Toll Road
Development of 6 lane access controlled Greenfield Regional Expressway on Northern side of Hyderabad from Girmapur Village (Design Ch. 1+518) to Tangad Palle Village (Design Ch. 160+000) for a Design length of 161.518 Km in the state of Telangana und
Toll Road
Development of 6 lane access-controlled Agra-Gwalior greenfield highway in the state of Uttar Pradesh, Rajasthan and Madhya Pradesh on BOT(Toll) Mode
Toll Road
Development of 6 lane Greenfield Nashik – Ahmednagar – Solapur – Akkalkot section of NH-60 in the state of Maharashtra under NH(O) on BOT (Toll) Mode.
Toll Road
Development of 8- Lane Elevated Flyover at Tier 1 on Single Pier including upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed section of NH-60 in the state of Maharashtra under NH(O) Projects on Bu
Toll Road
Development of a 400 kV Bikaner Sikar D/C Power Transmission Line for evacuation of power from wind & solar
Energy Generation
Development of a 400 kV Bikaner Sikar D/C Power Transmission Line for evacuation of power from wind and solar power in Rajasthan
Power Distribution · ends 2044
Development of a 7.2 MMTPA Iron Ore Export Terminal at the Waterfront West of the Breakwater on DBFOT basis (Mormugao Port Trust, Goa)
Port · ends 2041
Development of a Coal Terminal at Port of Mormugao, Goa on Design, Build, Finance, Operate and Transfer (DBFOT) Basis
Port · ends 2039
Development of a Container Terminal at Diamond Harbour near Kolkota Port, in the State of West Bengal on DBFOT basis
Port · ends 2043
Development of a Container Terminal at Tuna Tekra in Kandla Port Kutch region in the State of Gujarat on DBFOT basis
Port · ends 2043
Development of a multipurpose Berth and a Mechanised Berth at Haldia Dock -II (North), Haldia Dock Complex(HDC), Kolkata Port Trust
Port · ends 2042
Development of a multipurpose Berth and a Mechanised Berth at Haldia Dock -II (South), Haldia Dock Complex(HDC), Kolkata Port Trust
Port · ends 2042
Development of a new terminal termed as the extension of the existing container terminal, Outer Harbour, extending upto the Eastern breakwaters, at Visakhapatnam Port on Design Build, Finance, Operate and Transfer (DBFOT) basis
Port · ends 2043
Development of a Riverine Multipurpose Jetty at the Outer Terminal-1 in the upstream of 3rd Oil Jetty at Haldia Port in order to handle bulk cargo, commodities Coal, Iron ore & other dry bulk cargo on DBFOT basis
Port · ends 2042
Development of additional liquid bulk terminal at Jawaharlal Nehru Port (JNPT)
Port · ends 2044
Development of Affordable Healthcare Facilities’ at Barbil in the State of Odisha
Social Infrastructure
1
2
4
Page 5
6
23
24
All countries and sectors →