Concessio
Infrastructure Intelligence
Browse
Docs
App
Concessio Registry · Country directory
Infrastructure concessions in India
2,394 tracked concessions in India, 1 published with verified detail. Each resolves a canonical Concessio ID. Page 6 of 24.
Development of composite logistics hub at Katni, Madhya Pradesh under DBFOT (Toll) Basis
Toll Road · ends 2042
Development of Container Terminal at Ennore Port, Tiruvallur District in the State of Tamil Nadu
Port · ends 2043
Development of Container Terminal at New Mangalore Port on BOT basis
Port · ends 2040
Development of Container Terminal at Tuna-Tekra, Deendayal Port on BOT basis under PPP mode
Port · ends 2052
Development of Dry Bulk Terminal at Tekra near Tuna on BOT basis
Port · ends 2040
Development of Eco-Tourism Resort in Lalaji Bay, Long Island, Andaman and Nicobar Islands through PPP mode
Social Infrastructure
Development of Eco-Tourism Resort in Minicoy Island, Lakshadweep Islands through PPP mode
Social Infrastructure
Development of Ecor-Tourism Resort in Lalaji Bay, Long Island, Andaman and Nicobar Islands through PPP mode
Social Infrastructure
Development of Eighth Berth as Container Terminal on Build Operate & Transfer (BOT) basis at Tuticorin Port
Port · ends 2039
Development of EQ 1 berth by replacement of the existing EQ1 and part of EQ2 berths in the north of the Inner Harbour of Vishakhapatnam Port
Port · ends 2040
Development of EQ 1A berth on south of EQ 1 berth for handling Thermal Coal and Steam Coal in the Inner Harbour of Vishakhapatnam Port
Port · ends 2040
Development of Four lane of Mangwan to MP/UP border section (km 98/2 to km 46/6) of NH 27 on DBFOT (Toll) basis
Toll Road · ends 2036
Development of Four lane of Satna to Bela section (km 155/0 to km 203.04) of NH 75 on PPP basis following DBFOT (Toll) basis in the State of MP
Toll Road · ends 2036
Development of Four lane of Sidhi to Singrauli section (km 83/4 to km 195/8) of NH 75E on DBFOT (Toll) basis
Toll Road · ends 2036
Development of Fourth Container Terminal at Jawahar Lal Nehru Port Trust
Port
Development of Ganga Driveway and Riverfront Development from Digha to Didarganj at Patna on BOT (Toll) basis.
Toll Road · ends 2037
Development of Garhmukteshwar to Meerut Section of SH-14 (from km 0.000 to km 36.500) to four lane with paved shoulder in the State of Uttar Pradesh
Toll Road · ends 2040
Development of Gwalior Jhansi up to Ghonga village via Billua Road BOT (Toll)
Toll Road
Development of housing for Central Para Military Forces (CPMF) through BoT (Annuity) mode for 10 clusters (Lot 2)
Social Infrastructure
Development of Integrated Multi Modal Logistic Hub (IMLH) Project at Nangal Chaudhary in Haryana under PPP mode on DBFOT model
Other Infrastructure
Development of International Airport at Khushinagar
Airport · ends 2042
Development of Mega Container at Chennai Port
Port · ends 2040
Development of minor sea port at vizhinjam on DBFOT basis
Port · ends 2054
Development of Multi Modal Logistics Hub at Greater Noida, Uttar Pradesh
Other Infrastructure
Development of Multipurpose Berth to handle clean cargo including containers on BOT basis at Paradip Port
Port · ends 2040
Development of Multipurpose Cargo Berth Off Tuna Tekra (Outside Kandla Creek) at Gulf of Kutch at Kandla on BOT basis under PPP mode
Port · ends 2052
Development of North Cargo Berth II for handling bulk cargo at Tuticorin Port on DBFOT basis
Port · ends 2040
Development of North Cargo Berth-III for handling bulk cargoes, Thermal Coal and Rock Phosphate, at V.O Chidambaranar Port on DBFOT basis
Port · ends 2042
Development of North Cargo Berth-IV for handling bulk cargoes, Thermal Coal and Copper Concentrate, at V.O Chidambaranar Port on DBFOT basis
Port · ends 2042
Development of Offshore Multipurpose Cargo Berth at Mumbai Port in the State of Maharashtra on DBFOT basis
Port · ends 2043
Development of Outer Harbour Container Terminal Project including Dredging and Construction of Breakwater at VOC Port on DBFOT Basis
Port
Development of Pune Metro Line- III from Hinjewadi - Shivajinagar on DBFOT basis under PPP model
Rail · ends 2048
Development of Road from Nelamangala to chikkaballapura section of SH-74 in state of karnataka
Toll Road · ends 2039
Development of road from NH-63 near Ginigere-Gangavathi to Sindhanur
Toll Road · ends 2037
Development of Satna-Chitrakoot (SH 11)
Toll Road · ends 2034
Development of Silos for storage of wheat on DBFOT basis under PPP mode at Kotkapura, Punjab
Social Infrastructure
Development of Single Point Mooring (SPM) & allied facilities off Veera, outside Kandla Creek at Kandla Port, Gulf of Kutch, Gujarat on BOT basis to handle crude (petroleum) oil
Port · ends 2042
Development of Sinnar-Nashik section of NH-50 (from km 177.0001 to 201.350) in the State of Maharashtra with 4-lane through DBFOT IBOT (Toll)] basis.
Toll Road · ends 2036
Development of Sinnar-Nashik section of NH-50 (from km 177.0001 to 201.350) with 4-lane through DBFOT IBOT (Toll)] basis.
Toll Road
Development of Six laning of Chilkaluripet-Nellore section of NH 5 from km 1182.802 to km 1366.547 in the State of Andhra Pradesh under NHDP Phase V on BOT (Toll) project on DBFO pattern
Toll Road · ends 2033
Development of Solar Park in
Energy Generation · ends 2040
Development of Solar Park in Rajasthan at Bhadla Ph-IV of 500 MW
Energy Generation · ends 2040
Development of Solar Park in Rajasthan at Bhadla Phase- III, Jodhpur of 1000 MW
Energy Generation · ends 2040
Development of Solar Park in Rajasthan at Fatehgarh of 1500 MW in Jaisalmer
Energy Generation · ends 2040
Development of Sonnagar-Gomoh Section (261.35 Km) of EDFC(Eastern Dedicated Freight Corridor) on Hybrid-DBFOT) model on PPP mode
Toll Road · ends 2046
Development of Standalone container handling facility with a quay length of 300m towards North at Jahawar Lal Nehru Port Trust
Port · ends 2039
Development of Steel Silos under Hub & Spoke Model_Project-1
Toll Road · ends 2047
Development of Steel Silos under Hub & Spoke Model_Project-2
Toll Road · ends 2047
Development of Steel Silos under Hub & Spoke Model_Project-3
Toll Road · ends 2047
Development of the Assam -1 Housing Cluster on BOT (Annuity Basis)
Social Infrastructure
Development of the Assam -2 Housing Cluster on BOT (Annuity Basis)
Social Infrastructure
Development of the Kadarpur NCR Housing Cluster for CPMF on BOT (Annuity Basis)
Social Infrastructure
Development of two lane carriageway to Dabadeh to Bhawan\nMandi
Toll Road · ends 2035
Development of two lane Road of Beawer- Gomti section of NH 8
Toll Road · ends 2034
Development of two Strategic Reserves at Chandikhol Odisha and Padur II, Karnataka projects on DBFOT through PPP mode
Energy Generation
Development of Vizhinjam International Multipurpose Seaport Project
Toll Road
Development of Vizhinjam International Multipurpose Seaport Project
Port · ends 2054
Development operation & Maintenance of Dadu to chhan section of SH 37 from Km. 40 to Km. 144
Toll Road · ends 2040
Development, O&M of Gadoj-Majri to Haryana/ Rajasthan Border and Majri to Neemrana under DBFOT (Toll) Basis
Toll Road · ends 2042
Development, O&M of Hanumangarh to Abohar section of SH-7A (up to Punjab border) on DBFOT Toll basis.
Toll Road · ends 2041
Development, Operation & Maintenaace of Ratangarh-Churu Highway project (section of SH-107 from km 0.00 to km 40.993) through PPP on DBFOT Toll Basis.
Toll Road · ends 2043
Development, Operation & Maintenance of Dungargarh to Rajgarh Section of sH-06 from Km. 71to Km. 231
Toll Road · ends 2040
Development, Operation & Maintenance of Mangalana function to Khatu Section of SH-2B from Km.0.0 to Km.52and Makranato Parbatsar Section of SH-20 from Km. 0.0 to Km. 22.20
Toll Road · ends 2040
Development, operation and maintenace of Chomu chandwaji on SH-8B (total 15.4 km)
Toll Road · ends 2041
Development, Operation and Maintenace of Sri Ganganagar - Pacca Saharana Setion of SH 36 in Rajasthan under DBFOT (Toll) Basis
Toll Road · ends 2042
Devi Ahilyabai Holkar Airport Indore
Airport · ends 2038
Dewas Bypass Four & Six Laning Project
Toll Road · ends 2043
Dhamra Port Odisha
Port
Dhamra Port Project Phase - I
Port · ends 2041
Dholera Ultra Mega Solar Park
Energy Generation · ends 2049
Dhonithanda Wind Project Limited
Energy Generation · ends 2035
Dhule Palesner Tollway Lmited
Toll Road · ends 2027
Dhule Transmission (DPTL)
Transmission
Dighi Port (Maharashtra)
Port · ends 2062
Dighi Port Limited
Port · ends 2058
Dirang Energy Private Limited - Gongri HEP
Energy Generation · ends 2053
Divine Solren Solar park
Energy Generation · ends 2042
DJ Energy Ratlam Wind Farm
Energy Generation · ends 2039
DJ Jasdan Energy Private Limited
Energy Generation · ends 2039
DJEPL and UUPPL
Energy Generation · ends 2044
Dodson-Lindblom Hydropower Private Limited
Energy Generation
Donyi Polo Airport Itanagar (Hollongi)
Airport · ends 2049
Doshion
Other Infrastructure
DP Jain Nagda Gogapur BOT Annuity Road Project Private Limited
Toll Road · ends 2029
DP World Tuna Tekra Container Terminal Expansion
Port · ends 2055
Dr. Babasaheb Ambedkar International Airport, Nagpur (GMR Nagpur International Airport Limited)
Airport
Drinidhar Power Project
Energy Generation · ends 2046
Dropping Monetization of Telecom Tower Assets of BSNL under an Operate-Maintain-Transfer (OMT) concession
Telecom
DS Toll Road Limited
Toll Road · ends 2026
Durg Bypass
Toll Road · ends 2028
Dwarka Expressway NH-248BB
Toll Road · ends 2054
East Hyderabad Expressway
Toll Road · ends 2022
East North Interconnection (ENICL Sterlite)
Transmission · ends 2052
East North Interconnection Company Limited
Transmission · ends 2036
East-West Gas Pipeline
Gas Distribution · ends 2032
Eastern Peripheral Expressway (NH No. NE-II)
Toll Road · ends 2039
EDEN Renewables India Rajasthan Solar PV Plant
Energy Generation · ends 2046
EGP India - Thar
Energy Generation · ends 2041
Eight laning of Mukarba Chowk to Panipat of NH 1 (DEL-HRY)
Toll Road · ends 2040
Eight/Six Laning of Delhi Meerut Expressway from Km. 8.360 to Km. 27.740 (UP Border to Dasna) oh NH-24 on Hybrid Annuity Mode (Package II)
Toll Road · ends 2041
1
2
5
Page 6
7
23
24
All countries and sectors →